European Integrated Hydrogen Project
Project logo
|
| Full project name
| HySafe "Safety of Hydrogen as an Energy Carrier"
| Project (geographical) scope and type
| European Integrated Project
| Project acronym
| EIHP; EIHP1 (Phase I); EIHP2 (Phase II)
| Project website
| http://www.eihp.org
| Project main objective(s), goal(s)
|
The objectives of the project were to initiate and provide inputs to support the development of the
legal requirements and standards at EU and global level for the approval of hydrogen-fuelled road
vehicles, hydrogen refuelling infrastructure, and the relevant interfaces. EIHP, a partnership between
the European Hydrogen Industry supported by the European Commission, provided inputs for
regulatory activities at European and global level to facilitate harmonised procedures for the approval
of hydrogen-fuelled road vehicles. In the fi rst two-year phase of EIHP (1998-2000), proposals were
developed for harmonised draft regulations for the approval of hydrogen-fuelled road vehicles.
EIHP2, the three-year follow-up to EIHP (2001-2004) provided inputs for regulatory and standardisation
activities at European and global level, facilitating the safe development, introduction and daily
operation of hydrogen-fuelled vehicles on public roads and their associated refi lling stations.
Comparative risk and safety analyses (developed from the work undertaken in EIHP with respect
to the release of hydrogen) provided data in suffi cient depth to enable the partnership to optimise
the required inputs for hydrogen-related standards and regulations. The proposals for regulations
for the approval of hydrogen systems on road vehicles were submitted to United Nations Economic
Commission for Europe – Working Party 29 (UN-ECE WP.29) in spring 2001 for further discussion and
have since been monitored and continuously improved to achieve wide international consensus.
| Key issues
| Implementation of hydrogen vehicle and infrastructure technology can only succeed if the coordination of European R&D activities are intensified and technical progress is not hindered by differing regulations and licensing procedures within the EU member states.
The second phase included a more international scope, in particular the EU-USA link was stressed.
The EIHP project might be considered as the fathers of the NoE HySafe.
| Funding
|
€ 5 Mio total budget including max € 2.5 Mio EC funding (Phase I) € 5 Mio total budget including max € 2.5 Mio EC funding (Phase II)
| Contract
|
JOE3-CT97-0088 (Phase I) ENK6-CT2000-00442 (Phase II)
| Project start
|
1 February 1998 (Phase I) 1 February 2001 (Phase II)
| Project end
|
31 January 2000 (Phase II) 31 January 2004 (Phase II)
| Coordinator contact details
|
Reinhold Wurster
L-B-Systemtechnik GmbH
Daimlerstrasse 15
85521 Ottobrunn
Germany
Phone: +49-89-608 110 33
Fax +49-89-609 97 31
Mail: coordinator@eihp.org
Web: http://www.lbst.de
| List of participants (organisation name, country)
|
Phase I:
- Hydrogen Systems, B
- BMW, D
- Hamburgische Elektrizitätswerke, D
- LBST, D
- Messer, D
- INTA, E
- Air Liquide SA, F
- Renault, F
- EC-Joint Research Centre, NL
- Volvo, S
Phase II:
- Vandenborre Technologies, B
- BMW, D
- DaimlerChrysler, D
- Ford, D
- FZK, D
- LBST, D
- Linde, D
- Messer, D
- Opel, D
- INTA, E
- Air Liquide SA, F
- Commissariat à l'Énergie Atomique, F
- Air Products, GB
- BP, GB
- Shell, GB
- NCSR Demokritos, GR
- EC-Joint Research Centre, NL
- Det Norske Veritas, N
- Norsk Hydro ASA, N
- Raufoss ASA, N
- Volvo, S
| Organisational structure
|
The project was conducted in two phases, Phase I and Phase II.
Phase I is subdivided into eight work packages or tasks:
Task 1: Survey/ analysis of rules, regulations and licensing procedures in all participating countries
Task 2: Analysis of existing and planned H2 safety concepts and technologies
Task 3: Identification of rules and regulations ready for harmonization
Task 4: Identification of deficiencies in rules and regulations
Task 5: Identification of deficiencies in safety concepts and technologies
Task 6: Proposal for investigations to create a basis for standardization
Task 7: Proposal for safety concepts
Task 8: Proposal of pre-normative rules
The Phase II work is broken down into the following six work packages:
WP1 - Overall Coordination
WP2 - Refuelling Station
WP3 - Refuelling Interface
WP4 - Vehicles
WP5 - Safety
WP6 - Links "EU-USA", Cluster Activities
| Technical approach
| intentionally left blank
| Results, achievements
|
As a result, proposals for further investigations and improved safety concepts were compiled, together with concepts for standardised vehicle components, infrastructure components and draft harmonised regulations.
The main results in relation to RCS have concerned input to risk-assessment studies, risk-reducing
measures and recommendations of aspects to be addressed in future development of regulations and
standards.
In the EIHP2 project, designs of refuelling station concepts were established using simplified flow
assumptions. The fl ow diagrams were taken as a basis for coarse risk-assessment studies – so
called Rapid Risk Ranking (RRR) analyses.
The risk assessments of hydrogen infrastructure included the development of a RRR methodology
suitable for the level of information available at the time of study. Quantitative risk acceptance
criteria were also developed. The RRR methodology was tested on several different refuelling
station concepts for on-site hydrogen generation. These included on-site hydrogen generation
based on electrolysis, natural gas reforming, steam methanol reforming, ammonia splitting, as well
as liquid and compressed gaseous hydrogen supplied directly to the hydrogen refuelling station
by truck or pipeline. As a result of the coarse risk assessment studies, hazards were identifi ed for
the different concepts and segments of the refuelling stations studied, and risk-reducing measures
were identified. These aspects should be addressed in any future development of regulations and
standards to provide practical guidelines on how to minimise the associated risk.
- Gaseous hydrogen vehicle refuelling stations
A ‘Guideline for design, installation, operation and maintenance’ has been prepared. This draft
was submitted to ISO TC 197 WG11 ‘Gaseous hydrogen service stations’ to be evaluated as the
basis for the development of an international standard.
In fact the immediate implementation of the results as international standards did not take place. However, the industry is using the results as the only quasi-standard available in particular the suggested safety testing procedures.
Public results are to be found on http://www.eihp.org/eihp1/index.html and "Final Reports" on http://www.eihp.org/index.html.
|